01 / Inputs
One shift of data
Planned production time: 420 min · Run time: 373 min · Good parts: 18,848
02 / Results
Your OEE vs. world-class
OEE
74.8%
Typical
Availability
88.8%
WC 90%
Performance
86.1%
WC 95%
Quality
97.8%
WC 99.9%
Gap to 85%
2,572
parts / shift
- World-class
- You
03 / Where the time goes
Your biggest losses (minutes per shift)
BiggestPerformance (slow cycles, small stops)52 min
Availability (downtime)47 min
Quality (scrap & rework)7 min
Start with the biggest bucket. Availability losses respond to SMED and preventive maintenance; performance losses to small-stop tracking; quality losses to root-cause CAPA.